Guide

NSR-10 Title K (Colombia): minimum egress values, with clause numbers

Short answer

A table of minimum values from Title K of Colombia's NSR-10 (doors, stairs, ramps, egress), each with its clause number. The figures come from a copy Renka consulted and were not checked against the Official Gazette: confirm them in the current official text before use.

Updated October 23, 2026 · Published by Renka Consulting

What Title K is and how to use this guide

Title K of the NSR-10 (Reglamento Colombiano de Construcción Sismo Resistente, Colombia's seismic-resistant construction regulation) gathers complementary requirements for Colombian buildings, including the means of egress: doors, stairs, ramps, corridors and emergency lighting. This guide collects some minimum values that a designer or reviewer often consults, each with its numeral.

Only rules that the team marked as verified are published. No figure taken from trade practice or from secondary sources appears, and one figure for stairs in single-family housing that contradicts another in the same numeral was left out.

Evacuation doors

Doors
NumeralRuleValueApplies to
K.3.8.2.1Evacuation door: minimum clear width (700 mm in a bedroom)800 mmGeneral
K.3.8.2.1Evacuation door: minimum clear height2 mGeneral

Units: mm, m. They are shown as the copy consulted reads them.

Stairs

Stairs
NumeralRuleValueApplies to
K.3.8.3.3Stair for public use or with more than 50 occupants: minimum width1.2 mPublic use
K.3.8.3.3Interior stair in a dwelling: minimum width0.9 mGeneral
K.3.8.3.4Minimum tread depth280 mmGeneral
K.3.8.3.4Riser height100 to 180 mmGeneral
K.3.8.3.42c + h relationship (c = riser height, h = tread depth)620 to 640 mmGeneral
K.3.18.2.6Dwelling of up to 2 floors: minimum tread depth210 mmGeneral
K.3.18.2.6Dwelling of up to 2 floors: maximum riser height210 mmGeneral
K.3.8.3.5Landing: length equal to the stair width (maximum of 1.20 m required)1.2 mGeneral
K.3.8.3.5Maximum height difference between landings3.5 mGeneral
K.3.8.3.7Stair: minimum clear height2 mGeneral

"Applies to: public use" means the rule is read for stairs of public use or with more than 50 occupants. The 2c + h relationship adds two risers and one tread.

Ramps

Ramps
NumeralRuleValueApplies to
K.3.8.6.2Evacuation ramp: maximum slope 1:12 (other pedestrian ramps 1:8)1:12General
K.3.8.6.3Ramp: maximum cross slope1:48General
K.3.8.6.4Ramp: minimum width1.1 mGeneral
K.3.8.6.5Ramp: minimum clear height2 mGeneral

A 1:12 slope rises 1 m for every 12 m of horizontal run.

Egress and emergency lighting

Egress and lighting
NumeralRuleValueApplies to
K.3.5.1.3Dead-end corridor: maximum length6 mGeneral
K.3.9.2Emergency lighting: 10 lux average and 1 lux minimum10 luxGeneral

Accessibility in buildings open to the public

These rules are not from Title K but from Decree 1538 of 2005, and they apply only to buildings open to the public.

Accessibility (Decree 1538 of 2005)
ArticleRuleValueApplies to
Art. 9Building open to the public: at least one barrier-free entrance1 entrancePublic use
Art. 11Building open to the public: at least one accessible restroom1 restroomPublic use
Art. 11Accessible parking: 2% of the spaces, minimum 12%Public use

What changed after the copy consulted

The NSR-10 was adopted by Decree 926 of 2010 and has been amended several times. Among the amendments are Decrees 2113 of 2019, 1711 of 2021 and 1401 of 2023. We did not review which numerals of Title K they touched; that is why the rule is to check each figure against the current text before using it.

Worked example: does this stair comply?

Three hypothetical stairs against rules K.3.8.3.4 of the stairs table: minimum tread depth, riser height within the range, and 2c + h relationship within the range. The measurements are invented; the code does the calculation.

Three hypothetical stairs
Stair2c + hTread compliesRiser complies2c + h complies
Tread 280 mm, riser 170 mm620 mmYesYesYes
Tread 300 mm, riser 190 mm680 mmYesNoNo
Tread 250 mm, riser 160 mm570 mmNoYesNo

It is an example of the method with the figures of the copy consulted. It is not a check of a real project and does not replace review by a professional.

Limits of this guide

  • It is not a complete summary of Title K or of the NSR-10; topics and exceptions are missing.
  • Some conditions depend on the use and on the number of occupants. Each row says what it applies to, but the classification of your building is yours.
  • It does not replace the review of a licensed engineer or architect, or that of the curaduría (the urban-planning office) that issues the building license.
  • What depends on the local land-use plan (plan de ordenamiento territorial: clear heights, minimum areas) is not here.

Frequently asked questions

Are these figures current?

They are those of the copy consulted. They were not checked against the Diario Oficial, and the regulation has had later amendments. Confirm them in the official text before using them in a design or an opinion.

Why are some rules you hear about on site missing?

Because only those the team could verify are published. Values from trade practice or from secondary sources were left out on purpose.

Does it apply to housing?

Each row says whether it is general or for public use. Interior stairs in dwellings have their own row; the classification of your building is yours to make.

What do I do if two sources give different figures?

Whatever the current official text says. If you are not sure, consult the curaduría or a licensed engineer.

Sources

NSR-10 Title K: values and clauses · Renka Consulting