- Construction S-curve: how it is built and how to read itWhat an S-curve is, how to build it step by step from planned value and dates, and how to read ahead or behind. Includes a calculated worked example.Read the guide
- Unit-price analysis (APU): what it is and how it is calculatedWhat a unit-price analysis is, its four blocks (materials, labor, equipment, transport) and a worked example for one square metre of wall with every line calculated.Read the guide
- V2F form (Bogota, IDIGER): post-earthquake evaluation step by stepHow the V2F post-earthquake building evaluation form is organized, how its classification is reached and what a professional must validate.Read the guide
- NSR-10 Title K (Colombia): minimum egress values, with clause numbersMinimum values for doors, stairs, ramps and emergency lighting from Title K of the Colombian code, each with its clause and a warning to check the Official Gazette.Read the guide
- SECOP II (Colombia): how to evaluate whether a tender fits your companyCriteria, in order, to decide whether a SECOP II tender is worth pursuing: type, qualifying requirements, budget, schedule and risks. With an example and official guides.Read the guide
- Spreadsheet vs construction software: when one is enough and when it is notAn honest comparison by category: when a spreadsheet still works for a project, what signs show it no longer does, and an example of a silent error.Read the guide
- WhatsApp vs site log: when the chat is no longer enoughChat is for coordinating and a site log is for recording. A comparison by category of what each does well and how to use both without doubling the work.Read the guide
- Site logbook format: which fields it carries and what each one is forThe fields a site logbook carries, what each one is for, an example day with invented data and when it makes sense to move to a digital logbook.Read the guide
- S-curve in Excel: how to build it step by step, with an exampleHow to build an S-curve in Excel: activity table, planned-progress formula per day, cumulative total and a worked example. With the limits for when the sheet is not enough.Read the guide