Services
Choose based on what you need to solve: evaluating a tender, documenting progress, adding technical support or keeping your project under control. Each service page explains what you receive and who it’s for. We agree on scope and fees before we start.
Contract documentation
We organize the field records and prepare the documents your contract requires. The engineer reviews the content, identifies gaps and signs the agreed professional deliverables.
Your project documented every week, with no forms to fill out.
Progress, costs and appendices assembled for the monthly review.
We close out your project with no loose ends.
Renka as your project’s documentation arm, month after month.
One-off consulting
Technical review of projects, disputes and SECOP opportunities based on your company’s profile. You receive findings, supporting evidence and recommendations to decide your next step.
A signed technical opinion when you need certainty, not guesswork.
Decide which tenders to review with your company’s profile in view.
We file the right request before the deadline works against you.
On-demand engineering team
We agree on the profile, hours, working arrangement and responsibilities of the external team. The start date and time commitment are set out in the proposal.
Delegated project oversight
For public agencies, trust companies, developers and companies with their own projects that need an independent oversight consultant with professional accountability.
Project management and control
We compare progress and costs against the plan, organize safety management and review open items before the oversight progress cutoff. It adds the schedule forecast as a range, the risk register, change orders, subcontracts and handover with after-sales. It also covers cash flow with the month the cash runs out, the materials inventory and the machinery service record. Results depend on the project’s records and supporting documents.
MS Project-style schedule and S-curve: planned vs. actual, every week.
Budgeted vs. actual and a live margin per project. Every cost you record updates the margin instantly.
Unit price analyses with each supplier's verified price and a board that shows who leads each product.
Your project’s SG-SST set up and up to date, without adding anyone to payroll.
Spot missing supporting documents and observations before the oversight progress cutoff.
The formal question stays in the project file, not in a chat.
A punch list by work front, not a loose Excel file.
Digital engineering
The platform takes on the repetitive work of the technical office: your Excel form is marked up once and from then on fills itself with the project’s data, and a scanned drawing comes out as an editable CAD file, in layers and to scale. No one has to copy the same figure into five documents again. The survey and the point cloud are also measured against the design; accuracy depends on the source survey.
Your forms, filled in on their own. Send us your form and we return it with the letterhead intact.
We convert your paper, PDF or image drawings into editable CAD files.
Construction and project delivery
We are opening this line: civil works, minor works, remodeling and maintenance, with scope, price and billing basis in writing before we start. What already exists is the method: the work is documented and tracked for cost and progress on the same platform behind our site logs and oversight. Permits, licenses, bonds and requirements are defined according to the scope of each contract.
Your project with scope, budget and a record from day one.
You choose the billing basis; the cost record is the same.
Repairs and fit-outs with a closed scope and a record of what was done.
Drawings, quantities and budget from Renka, and the work built from them.
How we quote
20 minutes to understand the contract, scope and timelines. No commitment.
You receive the scope, deliverables, schedule and quote in writing.
We agree on who is responsible, the inputs and the start date. We review the results with you before finalizing the delivery.
Scope and responsibility
The proposal lists the documents you need to provide, the deliverables, the reviews and who is responsible for each. If the project’s needs change, we agree on the scope adjustment before carrying it out.
What sets us apart
Six things the platform does today and that you can check in the product. No savings figures: the numbers arrive with your projects, not before.
See the platform with my project →The usual
In a spreadsheet an empty cell passes for zero and the report goes out with a figure nobody measured.
At Renka
A missing value shows as “—” or “not observed”, never as a number that looks reasonable. The engineer sees what is missing before signing.
The usual
A chat or a loose PDF mixes the standard with rule-of-thumb figures, and nobody knows which is which.
At Renka
Every drawing rule declares its status: verified, secondary or unverified. Only what is verified is presented as a standard; the rest is marked as a recommendation. The SG-SST catalogue marks as secondary whatever does not come from the official text.
The usual
An assistant that writes on its own leaves records nobody reviewed.
At Renka
Roko prepares the action with a summary and writes nothing until a person confirms it, on the web or in Telegram.
We do not publish savings figures or clients we cannot certify. Renka was founded in 2026 and we do not invent a history for it.
Next
Tell us about the contract. In 20 minutes we’ll recommend the package or combination that fits best and put it in writing for you.
Your data