Renka platform
Construction management software: from quote to billing, every decision backed by its source
Quoting, scheduling, site log, subcontracts, safety and invoicing in one place, built for the site engineer working from a phone and for the office that needs figures it can defend.
The platform in 1:30
Watch it work.
Site diary, Telegram, Roko, unit-price analysis, S-curve, drone, OHS, post-earthquake, SECOP and the client portal, on a single project. Narrated in Spanish, with on-screen text.
The problem
A construction site produces information every day and most of it gets lost along the way
The site log is in a notebook, the photos in a chat, the budget in a spreadsheet nobody dares to touch and the progress in the site engineer's head. When a meeting, a billing or a claim comes up, you have to reconstruct what happened.
The cost is not just time. A figure without a date, an author or a source can't support a billing or an argument with the supervising engineer, and a spreadsheet with a broken formula gives no warning.
How it solves this
You record once, in the field, and everything else comes from that
Field capture
The site engineer types, dictates or uploads a photo from the phone, or sends a note through Telegram. What the AI extracts is left as a draft for review.
A single source
The site log, the daily report, progress and costs feed each other. If a figure is missing, you see "—", not a zero that looks real.
A person decides
Roko, the assistant, proposes an action and waits for your confirmation before writing anything. What needs a professional's signature is signed by a professional.
Output ready to hand over
PDF, Excel or a link for the client, with dates, sources and verification status in plain view.
Modules
Pick the problem that costs you the most time today
Each module can be used alone or together with the others. They all share the same project, the same users and the same history.
- Digital site logThe daily record with weather, personnel, equipment and incidents; once published it is closed and can only be corrected with a stated reason.
- APU (unit price analysis) and budgetsUnit price analyses that recalculate on their own, flag what doesn't add up and show the origin of every price.
- Construction quoting toolQuotes built on your APU, in PDF, Excel or Word, and a link for the client to accept or reject.
- Progress control and S-curvePhysical and financial progress, earned value and a schedule forecast that shows the uncertainty instead of a single date.
- Tenders and SECOPSECOP II (Colombia) construction processes ranked by fit, a file per opportunity and proposals with versions.
- Post-earthquake assessmentDamage assessment with the IDIGER V2F form (Colombia), from the phone, with crews and citizen reports.
- SG-SST and complianceSG-SST self-assessment (Colombia, Res. 0312/2019) with supporting documents per standard and tracking of insurance policy expiry.
- Reality capture and BIMOrthomosaic from drone photos, 360 walkthroughs by date, measurements on the map and an IFC model viewer.
- Construction sustainabilityWaste, water, energy and embodied carbon with the source, the year and the status of each factor.
- Subcontracts and change ordersSubcontractor payment certificates with advance payment, retention and supporting documents, and change orders with substantiated cost and time.
- Daily report and client portalDaily report with crew, items and attendance by link, and a portal where the client sees what is published and approves.
- Companies, roles and support accessEach company sees only its own data, with permissions by role and by project. Support access needs a reason, lasts 2 hours and leaves a log the company reads.
What sets it apart
Differences you can check on the screen itself
- Every figure says where it comes from
- An APU price (unit price analysis) shows whether it comes from your own price bank, a reference list, an assumption or the document. An emission factor carries its source, year and status. If the figure doesn't exist, you see "—".
- Regulations carry their verification status
- Nothing is presented as a regulation unless it was checked. In Colombia, the scales of Resolution 0312/2019 were checked against a public copy of the official text; not against the signed Diario Oficial, and the platform says so.
- Roko proposes, you confirm
- The assistant prepares the action (for example, a site log entry or a purchase order), the proposal is stored on the server and it only runs when someone with permission confirms it, once.
- Telegram, where the team already is
- Link a chat with a code and query site data or send notes and photos without opening the dashboard.
- A professional signs what must be signed
- The AI suggests; it does not classify a building's habitability or sign a report. There is an engineering service behind it for those who need one.
- Interface in four languages and country profiles
- The interface is translated into Spanish, English, Portuguese and Chinese, with tax profiles and texts for Colombia, Mexico and the United States.
- Progress and stalled tasks
- Batches show percentage and stage and flag a lack of progress. Roko can query operational tracking for unit price analysis, quoting, the engine and post-earthquake work to detect runs without a heartbeat; this query does not retry or cancel tasks.
- Field finding through to closure
- A finding captured via Telegram can become a pending task with an assignee and closure evidence, keeping follow-up from getting lost in the chat.
- Documentary forensic audit
- Batches of construction and contract documents become facts with citations. Contractual, administrative, technical and transparency checks produce findings with severity, a sampling plan and a human validation queue; the Excel pack gathers findings and pending items. When preparing escalation to audit, a major finding is classified as a major nonconformity.
- Each company sees only its own
- Permissions by company, role and project run in the database. Support access needs a reason, lasts 2 hours and leaves a log the company reads.
Software or service
Would you rather have an engineer do it?
The platform is the software your team uses. The services are the work of a licensed civil engineer who uses that same platform: signed site logs, supervision reports, scheduling, contract closeout. You can take one, the other or both.
See the engineering servicesNext step
Let's try the platform with one of your projects
Tell us about your project and we'll show you this module with your own data, no commitment.