Post-earthquake assessment

Post-earthquake damage assessment with V2F: from the phone, signed by an engineer

After an earthquake, many buildings must be assessed fast. The platform puts the IDIGER V2F form (Colombia) on the phone and leaves the final decision to a professional.

The problem

After an earthquake there are too many buildings to assess and too few orderly forms

Crews fill in paper forms, the photos stay on each inspector's phone and the office doesn't know how many buildings are left or where each crew is.

On top of that, people report damage through scattered messages that nobody sorts by urgency.

How it works

From the call to the signed report

  1. Citizen report

    The community opens a public link, with no account, and enters the type of damage, people on site, address and optional photos. Each report arrives as a request with a priority suggested by rules.

  2. Crews

    You assign assessments to crews and sort them by straight-line proximity, without road routing. A building is not assigned twice. The crew sees address, neighborhood and location, without photos or personal data.

  3. V2F form in the field

    The inspector fills in the form on the phone, with photos. Each submission step can be repeated without duplicating the record.

  4. Review and signature

    The form's rules calculate a preliminary classification; the AI only suggests. The engineer reviews, decides habitability and signs. "Signed" is only accepted if the engineer has already approved.

What sets it apart

What you can check, not just take on faith

The rules live in code
The form's rule-based classification is written into the system and can be audited; the model only fills in boxes.
What wasn't seen stays as "not observed"
Boxes are not filled in by assumption.
Photo privacy
Includes face blurring in the browser. The first time it downloads about 14 MB and needs a connection for that download.
Other forms
Besides V2F, there are ATC-20 forms and a rapid assessment form for Mexico.
The site on a 3D map
Search the address, drop a pin or use your location, and the map brings the municipality, department, country and elevation from open sources. Whatever it can't find stays as “—”. Seismic hazard is not shown on the map, and the map needs a browser with 3D graphics.
NSR-10 columns: supporting calculation
Quality can calculate a column M-N interaction diagram. This is a supporting calculation: it does not replace the structural engineer’s design or signature, or check slenderness or second-order effects.

What it doesn't do

The limits, stated up front

  • The system does not classify habitability on its own: a professional (engineer) decides and signs it in the review.
  • The citizen report is not an assessment or an emergency call, and the person reporting is told so.
  • V2F, IDIGER and the habitability levels are Colombian; for other countries the platform offers other forms.
  • The crew order is by straight-line distance, not by routes or traffic.
  • Field use without a connection has not been tested on real devices, so we do not promise it today. Check your coverage before the event.

Compared with what you use today

Compared with paper, spreadsheets and chats

Spreadsheets
A spreadsheet does not assign crews or order reports. Here every assessment has a crew, a status and a signature.
WhatsApp and shared folders
Reports arrive mixed together. Here each one is a request with a suggested priority and a status.
Generic ERP
It doesn't know the V2F form or the rule that an engineer must sign.

Frequently asked questions

What people usually ask before trying it

Does the AI decide whether the building is habitable?

No. It suggests; the engineer classifies and signs, and the system won't let you mark "signed" without their approval.

Does it work without internet?

We do not promise it. Use without a connection has not yet been tested on real devices, so check coverage before an event. Face blurring needs a prior download with a connection.

What is V2F?

The damage assessment form used by IDIGER in Bogotá, developed from the 2002 form of the Colombian Association of Seismic Engineering.

Next step

Let's get your team ready before the next event

Tell us about your project and we'll show you this module with your own data, no commitment.

V2F post-earthquake assessment software · Renka Consulting