Construction sustainability
Construction sustainability: waste, water, energy and carbon with the source of each figure
You record waste weighings and consumption, and the platform compares them with the targets in Colombian regulation. Embodied carbon is calculated with factors that you load, each with its source.
The problem
Environmental indicators are put together at the last minute and without support
The waste and consumption report is pulled together right before an audit, with data taken from scattered receipts and sheets.
And embodied carbon is often calculated with generic factors without knowing what year or source they come from.
How it works
From the weighings to the target
You record weighings and consumption
Construction and demolition waste in kg, and the project's water and energy consumption.
It is compared with the target
For waste, the percentage recovered against the target in Resolutions 0472 of 2017 and 1257 of 2021 (Colombia), by municipality category and year. It flags whether you are a large generator (2,000 m² or more).
Water and energy
The minimum savings under Resolution 0194 of 2025 (Colombia) are compared by building type and climate zone. Electricity emissions are calculated with the grid factor for the year.
Embodied carbon
It is calculated on the lines of issued purchase orders, with your company's factors. It also shows in the APU, the quote and the order, and is compared with a lower-carbon alternative.
What sets it apart
What you can check, not just take on faith
- Each factor carries a source, year and status
- The 2024 electricity factor (0.22 kgCO2e/kWh, UPME, Colombia) is listed as verified; the 2022 one as secondary. With no factor for the year, the platform shows "—" and does not use another year's.
- No factor, the input stays out
- A material without a factor does not add to the total and is not filled in with an average.
- Verification status of the targets
- The waste targets are listed as verified; the water and energy percentages come from a reproduction and are marked as secondary until checked against the official PDF.
What it doesn't do
The limits, stated up front
- The table of carbon factors by material starts empty: there is no open database of embodied carbon by product for Colombia, and the platform does not invent one.
- The regulations and factors are Colombian. There are no targets loaded for other countries.
- It does not include management of certifications such as LEED, EDGE or Casa Colombia.
- It does not issue an environmental certification; it delivers figures with their source.
Compared with what you use today
Compared with the spreadsheet and the warehouse log
- Spreadsheets
- A spreadsheet uses the factor someone copied. Here the factor states its source, year and status.
- WhatsApp and shared folders
- Receipts get lost. Here the weighing is in the project record.
- Generic ERP
- An ERP doesn't know the regulation's waste recovery targets.
Frequently asked questions
What people usually ask before trying it
Does it come with material emission factors?
They are not preloaded. You load them yourself, with their source and year; this avoids presenting a number with no backing.
Is it useful in Mexico or the United States?
The targets and factors included are Colombian.
Will it certify my project?
No. It calculates and documents indicators; the certification is issued by whoever is responsible for it.
Next step
Let's put together your project's environmental indicators
Tell us about your project and we'll show you this module with your own data, no commitment.
On the same topic
Other platform modules