Construction quoting tool

Construction quoting with your own APU: from budget to client acceptance in one link

You build the quote on APU (unit price analyses) you already have, send it by email, and the client opens it, accepts it or rejects it from a link. You can see whether they opened it.

The problem

Quoting in Word and Excel produces different numbers in each file

The quote is built in a spreadsheet, pasted into a document and sent as a PDF. A last-minute change is enough for the PDF, the Excel and what the client understood to say different things.

Besides, nobody knows whether the client opened it, and the answer comes through a call or a chat that gets lost.

How it works

From the line item to "accepted"

  1. You start from an APU

    A quote line can take a saved APU as its base: the pinned version, or the APU as it stands today if none is pinned.

  2. Taxes by country

    The quote stores its currency and the country comes from that. In Colombia, VAT (IVA) on the profit with withholdings; in Mexico, 16% VAT on the whole base; in the United States, no VAT and sales tax by state.

  3. Output and sending

    It generates PDF, Excel and Word and emails it to the client in the quote's language.

  4. The client responds

    They open their own link, see the quote, accept or reject it and can upload files. The visit and the status are recorded: sent, viewed, accepted, rejected or expired.

What sets it apart

What you can check, not just take on faith

Same totals in PDF, Excel and portal
The Excel recalculates the totals with the same function the PDF and the client portal use, so the number matches in all three.
Market prices, only where there is data
Market ranges are loaded for Colombia. For Mexico and the United States they are not invented: the price is marked as an estimate to be validated.
Status in plain view
You know whether the client saw the quote, when they responded and which files they sent.
Visible commercial scenarios
The quote detail and client portal show saved commercial scenarios with their totals and terms.
Client downloads
From the quote portal, clients download the quote PDF and, when published, the supporting explanation and proposal PDFs.
The company signature, in the Word and the PDF
The quote generated in Word and PDF carries the company's signature block, so the document goes out ready to send.

What it doesn't do

The limits, stated up front

  • The email says "the provider accepted the email": that confirms delivery to the provider, not that the client read it. That is what the "viewed" status is for.
  • It does not issue electronic invoices. It is a quote, not a tax document.
  • Market ranges for Mexico and the United States are not loaded.

Compared with what you use today

Compared with Word, Excel and loose email

Spreadsheets
A change in the sheet doesn't reach the PDF. Here everything comes from the same calculation.
WhatsApp and email
You don't know whether they opened it. Here the link, the view and the response are recorded.
Generic ERP
The ERP quotes catalog products, not construction work with APU, AIU (administration, contingencies and profit) and taxes by country.

Frequently asked questions

What people usually ask before trying it

Does the client need an account?

No. They enter through their own link to the quote.

Which currencies and taxes does it handle?

Colombia, Mexico and the United States, each with its own tax rule. The country comes from the quote's currency.

Can I use my APU?

Yes. It is the starting point: a line takes the saved APU as its base.

Next step

Quote your next project with your own APU

Tell us about your project and we'll show you this module with your own data, no commitment.

Construction quoting software · Renka Consulting