Subcontracts and change orders

Subcontractor payment certificates and change orders without losing the thread of cost

Each certificate bills only the difference between cumulative work executed and what has already been recognized, deducts advance and retention, and is not approved without the social security supporting documents. Each change order starts from an RFI or an instruction and carries its cost and its time.

The problem

The change is agreed verbally and billed months later

When something changes on site, the work gets done and the paperwork arrives later. At month end nobody remembers who authorized what or how much of the advance has already been deducted.

And in Colombia, paying a subcontractor without their contributions up to date can leave the liability with the project.

How it works

From contract to payment and from change to approval

  1. You create the subcontract

    Project, subcontractor, NIT (tax ID), scope, advance and retention percentages, dates and items, pulled from the line items or typed in by hand.

  2. Payment certificate

    You record the cumulative work executed up to the cutoff; the platform bills the difference with what has already been recognized, deducts the advance in proportion, the retention and other deductions, and gives the net amount.

  3. Approval with supporting documents

    Approving is blocked without the PILA contributions form and the labor clearance for the period. Statuses: draft, approved, paid or voided.

  4. Change order

    It starts from an RFI, an instruction or a finding. It does not move to approval without the change's APU, an approver and a date. The time comes from the days the forecast's P80 moves or from those a person enters.

What sets it apart

What you can check, not just take on faith

No blind payments
The block for missing PILA and clearance is in the code, not a recommendation.
Cost and time with support
The change order's cost comes from the change's APU, and the time from the project's forecast or from an explicit figure.
Nothing is deleted once it has certificates
A subcontract with certificates is not deleted: it is archived.
Amendment with the cap already calculated
For an addition, extension, suspension or amendment, the draft brings the addition cap in minimum wages, what has already been added, the new completion date and the delayed schedule tasks as support. The system calculates those figures; the wording goes around them.
Documentary forensic audit
Batches of construction and contract documents become facts with citations. Contractual, administrative, technical and transparency checks produce findings with severity, a sampling plan and a human validation queue; the Excel pack gathers findings and pending items. When preparing escalation to audit, a major finding is classified as a major nonconformity.

What it doesn't do

The limits, stated up front

  • It does not verify the PILA form against the operator: it requires it to be loaded, it does not check its contents.
  • The certificate PDF is not an electronic tax document and is not issued to the DIAN (Colombia).
  • The withholding and social security rules cited are Colombian.
  • The change order flow covers event, quoted, approved, invoiced and rejected; it does not negotiate with the client.
  • The amendment is a draft for a lawyer to review; it is not signable as it comes out. The default cap is the one in Law 80 of 1993 (Colombia); it can be changed if the contract's regime sets another, and the person enters the minimum wage for each date.

Compared with what you use today

Compared with the cutoff spreadsheet and email

Spreadsheets
A cutoff spreadsheet doesn't stop you approving without supporting documents or remember the advance already deducted.
WhatsApp and email
The "go ahead, do it" leaves no support. Here the order requires an APU, an approver and a date.
Generic ERP
An ERP pays invoices; it doesn't measure cumulative work executed per item.

Frequently asked questions

What people usually ask before trying it

Does it calculate the advance and the retention?

Yes: it deducts the advance in proportion to what is billed and the agreed retention, and gives the certificate's net amount.

What happens if the PILA form is missing?

The certificate can't be approved until the PILA and the labor clearance for the period are loaded.

Where does a change order's time come from?

From the days the project forecast's P80 moves, or from the days a person enters.

Next step

Let's put your project's subcontracts and changes in order

Tell us about your project and we'll show you this module with your own data, no commitment.