
Juan Diego Poveda Gómez
Co-founder · Technical and contract management
Public and private construction · Colombia, Mexico and the US
Renka is the platform where a contractor quotes and evaluates tenders, plans, reports and bills its projects, with Roko preparing the drafts and a licensed engineer who reviews and signs.
If the photos are still on the site engineer's phone and the notes in a chat, the report gets written at night and billing waits. Here the site engineer sends photos and voice notes over Telegram, Roko builds the draft and a licensed engineer reviews and signs it. A missing figure shows as missing, never as an invented number.
Civil engineering with in-house software. Each builder gets its own space, with its projects and only the tools it hired. Your information never mixes with another client's, and the project stays yours. Meet the people who make it happen →
Reader RokoRead
Writer RokoDraftWhat sets us apart
Six things the platform does today and that you can check in the product. No savings figures: the numbers arrive with your projects, not before.
See the platform with my project →The usual
In a spreadsheet an empty cell passes for zero and the report goes out with a figure nobody measured.
At Renka
A missing value shows as “—” or “not observed”, never as a number that looks reasonable. The engineer sees what is missing before signing.
The usual
A chat or a loose PDF mixes the standard with rule-of-thumb figures, and nobody knows which is which.
At Renka
Every drawing rule declares its status: verified, secondary or unverified. Only what is verified is presented as a standard; the rest is marked as a recommendation. The SG-SST catalogue marks as secondary whatever does not come from the official text.
The usual
Photos stay on the site engineer's phone, notes in a chat, and the report gets written at night.
At Renka
The site engineer sends photos and voice notes over Telegram. Voice is transcribed and everything arrives as a draft to review, tied to that person in that company.
The usual
An assistant that writes on its own leaves records nobody reviewed.
At Renka
Roko prepares the action with a summary and writes nothing until a person confirms it, on the web or in Telegram.
The usual
A generic ERP ships one set of taxes and forms, and the rest is fixed by hand.
At Renka
Colombia, Mexico and the US, each with its procurement portal, taxes, concrete standard, post-earthquake assessment and response deadlines. Our engineers sign only in Colombia.
The usual
An app that depends on the connection can go blank at the inspection site.
At Renka
The site log, punch list, site rounds and daily report stay on the phone and upload by themselves when the signal returns, as long as the screen stays open (in testing; progress and photos don't). The IDIGER V2F form saves its draft on the device and is sent by hand. AI suggests; the engineer reviews and signs.
Running in production today and switched on per company, according to the contract.
With a caveat
We do not publish savings figures or clients we cannot certify. Renka was founded in 2026 and we do not invent a history for it.
Your data
How Roko works
The problem
The field produces messy information: voice notes, photos with no caption, one spreadsheet per contractor. Someone gathers it by hand, drafts it and checks it. That is engineer time spent copying, not deciding.
Roko works
Roko opens what arrived, sorts it, checks it against the contract and the applicable code, and drafts the document. Anything it cannot find is flagged as pending instead of being filled in.
Document ready
It comes out as Excel, PDF or Word, with every figure tied to its source. The engineer corrects and signs: responsibility is not delegated.
85 AI specialists across 47 platform modules, and an engineer who reviews and signs.
Renka in 1:44
From the site engineer writing reports at night to a project that documents itself: the six services, the platform and the engineer who signs. Narrated in Spanish, with on-screen text.
Start with your situation
We gather what's already in photos, chats and spreadsheets, tell you what's missing and put the report together for the engineer to sign. You can start with a single deliverable.
See how to prepare my submissionWe compare the opportunity against your profile, organize the sources and flag the requirements you need to verify before preparing the bid.
Explore SECOP analysisYes. Your company has its own space with all its projects. The team sends photos and notes over Telegram, Roko — the platform's assistant — prepares the drafts, and you only see what you hired.
See how the platform worksYour company brings its specialty and its relationship with the project. We agree on how to add documentation, technical control or automation, with clear responsibilities.
See how we can work togetherServices
From evaluating a tender to organizing the closeout: documentation, consulting, technical staff, project oversight, control, digital engineering and now also construction and project delivery. We agree on which area to cover and who is accountable for it.
A signed technical opinion when you need certainty, not guesswork.
External resident engineer, project manager or specialists. No payroll.
What is delivered
Independent supervision with professional accountability.
What is delivered
Your project’s schedule, costs and risk on a live dashboard.
Forms that fill themselves in and drawings converted to editable CAD.
What is delivered
We are opening this line: civil works, remodeling and maintenance, with scope and billing in writing.
Method
A 20-minute call. No endless form. We get to know your project, your contract and your deadline. If we’re not the right fit, we tell you who to turn to.
We put the deliverables, inputs, reviews, schedule and fees in writing. Any additional work is agreed before it is carried out.
The responsible professional validates the content and signs as the contracted service requires. Your team receives the files and knows the open items before using them.
Why Renka
The scope, the supporting documents and the person responsible are clear from the start, so you can evaluate the service against concrete criteria.
The team behind Renka

Co-founder · Technical and contract management

Co-founder · Technology
The platform
Each contractor has its own space with its projects and only the modules it hired. The team reports from the field, Roko prepares the draft and the engineer reviews and signs it. We open access when you sign up.
85 AI specialists, each with a trade. The vest and the tool show what each one does.
Run the module by chat and Telegram45 specialists
Routes every request2 specialists
Write15 specialists
Read photos and documents11 specialists
Analyze9 specialists
Draw plans and schedules3 specialistsThe quoting tool builds the bid from the APU. The model only picks an input from a closed list; the code does the arithmetic, flags what does not add up and the productivity rates that are assumptions, and keeps each version with its diff. The quote asks for confirmation before it goes out and is shared through a portal with a revocable link. The DANE ICOCED adjustment is approximate and names its source.
Roko checks the process against your company profile, points out the requirements you must verify and fills in Form 1 of the offer letter with the data you loaded in Settings. The decision to bid and the filing belong to your company.
Change an activity's duration and the knock-on effect shows in the activities that follow and in the end date, with an impact panel. The simulation lives in memory: it does not touch the current plan until you apply it, and the server validates the change. Site control forecasts completion as a range (P50, P80 and P95) with a productivity factor that is a declared assumption: it guides, it does not promise a date. Importing MS Project or Primavera requires a separate service.
The site engineer sends photos, location and voice notes over Telegram; the voice note is transcribed before the system decides anything. Each photo arrives with area, element, condition, criticality and recommendation, and the draft comes out in Excel, PDF or Word for the engineer to correct and sign. The link belongs to that person at that company. Proactive alerts come switched off: the company turns them on and they never exceed 3 messages a day per link. On the web, if the signal drops, the site log, punch list, site rounds and daily report stay on the phone and upload by themselves when it returns, without duplicating anything; this is in testing and does not cover progress or photos.
Upload a scanned drawing and the platform takes it to DXF with layers, with the technical justification in PDF. For US companies the drawings come out in feet. Each rule states whether its standard is verified, secondary or unverified, and only what is verified is presented as the standard. The engineer reviews before signing.
Insurance policies and licences warn you 30, 15 and 7 days before they expire, so you don't find out with the site stopped. Everything that expires (licenses, policies, social security enrollments, medical exams, machinery documents) sits in one list sorted by urgency, with reminders you can download to your calendar. The site round records opening, closing or inspection with the server's time, photos and signature, and comes out as a PDF. The SG-SST self-assessment (Resolution 0312 of 2019) and the savings of Resolution 0194 of 2025 come from tables the screen marks as secondary when they don't come from the official text. It supports your tracking; it is not legal advice or certification, and it is for Colombian companies only.
Each machine has a service record, hour meter and maintenance log. Bookings are made by project and by day, with no clashes between projects, and hour meter and fuel are logged at pickup and return. Rental is calculated from the verified hours.
Invoices and payment claims feed each project's cost and cash. Cash flow shows the month-by-month balance per project and consolidated, and the month the cash runs out; the assumptions are written by the person. Materials tracks batches, balance and actual waste against the APU allowance. The payment claim also comes out as an accounting exchange package in JSON; it does not connect to SIIGO or Alegra yet. Each billing statement shows which approval stage it is in and how long it has been there, based on the saved dates. When the project needs more money or more time, the draft amendment comes with the addition cap already calculated (by default, 50% of the initial value in minimum wages, as Colombia's Law 80 sets it), the new completion date and the schedule delays as support. It is a draft that a lawyer reviews before anyone signs.
The file gathers a project's contract, reports, evidence and open items into a dossier you can export as an audit folder. Contractual, administrative, technical and transparency checks produce findings with severity, a sampling plan and a human validation queue. A major finding is classified as a major nonconformity when escalated to audit.
Roko writes with the terms and criteria your team approves, builds each action with a summary and writes nothing until a person confirms it, on the web or in Telegram. Tasks are sorted on a board by status and by impact versus effort, and the team sees it live. If your company turns on the team office, you leave a request in one or two sentences and Roko splits it into steps that only look things up; anything that needs saving waits for your approval. What belongs to your company stays with your company: none of your data ever reaches another client.
NSR-10 is loaded clause by clause (1,246) along with the seismic hazard parameters for 1,117 municipalities from Appendix A-4. The analysis returns the applicable section, so each observation is checked against the code instead of taking the author's word for it.
Upload the inspection photos and the V2F form comes back filled in, with its partial A-E ratings and the overall one, as a replica of the official format. A batch takes up to 1000 files and is split by building: if the walkthrough covered three buildings, you get three assessments. Anything that couldn't be attributed is flagged, not forced into a building. A 3D map locates the site by address, by a pin or by your location, and brings the municipality, department and elevation; whatever it can't find stays as “—”. Drafts are saved on the device and sending once the signal returns is manual. The inspector reviews and signs.
Each contractor enters its own space and sees its projects. Modules are switched on according to the contract: what you didn't hire doesn't appear in the menu. Your information never mixes with another client's. The trust panel shows what Roko did with your data and, if our team steps in to help, it leaves a reason, a visible banner and a log you can read.
Every generated document is a draft until the responsible engineer reviews and signs it.
See the platform with my project →One country, its rules
The company picks its country and the platform follows: currency, taxes, procurement portal, codes and forms. Colombia stays exactly the same.
Free calculators
No sign-up. Every figure shows where it comes from and follows the country: Colombia, Mexico or the United States.
From direct cost to selling price with each country's formula: AIU with VAT on profit in Colombia, the LOPSRM unit price in Mexico, overhead, profit and sales tax in the US.
Calculate the price→Report timeProjects, reports per month, hours per report and your hourly rate: what doing it by hand costs each month, and what changes with the platform.
Calculate the hours→Company partnerships
If you have projects, clients or a capability that complements ours, let’s explore a first job together. We define where each team contributes and who is accountable for each deliverable.
For construction companies and oversight firms that need support with documentation, quality, scheduling or closeout.
For design firms, specialists and consultancies that want to add documentation or technical support to a specific opportunity.
For teams that want to explore automating their forms and better connecting their project information.
The first conversation carries no commitment. We review capabilities, responsibilities and terms before starting.
Frequently asked questions
Yes, we can explore a complementary scope: documentation for a contract, specialized technical support or form automation. First we review the opportunity, each company’s capabilities and who maintains the client relationship. Responsibilities, confidentiality and commercial terms are agreed before any information is shared or any work begins.
We start from your company's profile: experience, capacity and regions of interest. We review the process and its sources, point out the requirements you need to verify and prepare a Word draft. Deciding to bid and filing stay with your company.
Yes. The company's country is chosen when it is created and the platform works with its rules: in Mexico, ComprasMX, VAT with ISR and VAT withholding, Mexico City's NTC and the ISC post-earthquake evaluation; in the United States, SAM.gov, sales tax and retainage, ACI 318 in psi, ATC-20 postings and documents in English. Consulting signed by our engineers is in Colombia.
The service is the professional work: an engineer is accountable for the agreed scope. The platform is your company's space, holding your projects, the team's Telegram reports and Roko's drafts. No one else sees your information; we open access when you sign up.
Both. The engineering work is signed by a licensed engineer. The software gives your company its own space, with its projects and only the modules you hired. We run it; the project and its information are yours.
We take care of what usually holds up a construction contract: contract documentation (site log, reports, final settlement), quality and materials control, scheduling and progress control, delegated project oversight and contract defense before the contracting agency. Engineering deliverables carry the professional review and signature agreed in the service.
Both. On public works we use the forms of the DNP, ANI, INVÍAS, IDU or the contracting agency. On private projects we follow the protocol of the trust company, the disbursing bank or the parent company. The control is the same; only the format of the supporting documents changes.
Yes, in the appropriate role. On a large project we don’t compete for the prime contract: we come in as a specialized team within the contractor’s or the oversight firm’s team, as part of a consortium or joint venture, or in charge of a specific package — quality, contract documentation, scheduling, materials or closeout. We don’t rule out a project because of its size.
The civil engineer with a COPNIA professional license who leads that area of work, by name and with professional accountability. When the contract covers several areas, we appoint a contract director so the agency or the oversight firm has a single point of contact.
It depends on the scope: a monthly report is not the same as full project supervision. In the first 20-minute call, free of charge, we review your case; fees and timeline are written into the proposal before any work starts.
Yes, for the first draft. Roko, the platform's assistant, reads the site's audio, photos and documents — the contract PDF, the budget in Excel, the schedule — and builds the draft in Word, Excel or PDF. The engineer checks the data and conclusions and signs it when appropriate. With use, drafts adjust to the way your company writes.
Yes. You upload the walkthrough photos — from the browser or through the project chat — and the IDIGER V2F form comes back filled in: its five partial A–E classifications and the overall one, with one assessment per building when the walkthrough covered several. An engineer reviews, corrects and signs; the PDF is exported as a replica of the official form for filing. Anything no one managed to observe is marked as not observed — it is not filled in just to complete the field. In the field, the draft is saved on the device (sending it once the signal returns is manual), the walkthrough is split among brigades and a 3D map locates the site with its municipality and elevation; the AI suggests and the engineer signs.
The company is new, and we don’t invent a history for it. What can be verified is the experience of the people who lead it: quality control on the Bogotá Metro project with China Harbour Engineering Company Colombia, resident engineering on government contracts, and materials control and oversight reports on IDU urban infrastructure. Certified résumés and references are provided with the proposal.
We don’t author designs: no architectural drawings and no structural calculations from scratch — that’s the job of a design firm. Nor do we sell standalone templates without an engineer who signs. If we’re not the right fit, we tell you who to turn to.
Next
Tell us what you need to solve: a returned report, a quote to build or a SECOP process to evaluate. In a first conversation we review the fit and agree on the next step.