Renka service
We convert your paper, PDF or image drawings into editable CAD files.
We vectorize scanned, PDF or photographed drawings and return them as editable CAD — DXF, which opens in AutoCAD and compatible software — in layers and to scale, with the area schedule calculated from the linework. You recover old drawings, update as-builts and edit without redrawing from scratch.
What you receive
We agree on inputs, formats and reviews in the proposal. Drafts require validation; the professional signature covers the deliverables and responsibilities of the contracted service.
How we work
Scanned paper, PDF or photo — whatever state they are in.
The platform reads walls, gridlines, dimensions and spaces and builds the CAD file to scale, each element on its own layer.
We check every measurement against the original drawing. Anything the original does not let us read, we ask about before drawing it: we do not invent a dimension.
DXF + PDF ready to edit in AutoCAD or compatible software, with one round of adjustments included.
Ideal for
Company with an archive of paper or PDF drawings
Project that needs an editable as-built drawing
Projects that inherit drawings without source files
Teams that redraw plans by hand just to be able to edit them
Next
Book a 20-minute call and we’ll go over your contract’s details. We respond to your request, and the quote comes with scope and timelines in writing.
Other services