All services

Renka service

Work with Renka design and documentation

Drawings, quantities and budget from Renka, and the work built from them.

For those who prefer a single point of contact: we start from the drawings, quantities and budget that Renka prepares with its platform and build the work from that same documentation. Specialized design (structural, soil studies, building services with calculation reports) is out of scope unless an item in the proposal includes it.

Cadence
From scope to handover
Turnaround time
Schedule agreed in the proposal
Quote
Private, based on contract and volume

What you receive

Included deliverables

We agree on inputs, formats and reviews in the proposal. Drafts require validation; the professional signature covers the deliverables and responsibilities of the contracted service.

  • Editable CAD drawings and area schedule
  • Quantities and budget by chapter
  • Execution with a record of progress and cost
  • As-built drawings and closeout folder

How we work

Step by step

  1. We survey and define

    From your drawings or a site visit, we build the scope, quantities and budget.

  2. Engineer review

    A licensed civil engineer reviews the documents the platform prepares before they are used.

  3. We build

    The work is built from that documentation and recorded as it advances.

  4. Handover with as-builts

    What was built is documented so you can maintain and modify it.

Ideal for

Is this service for you?

  • Owners without drawings or a budget who want to build

  • Companies that prefer one party responsible from documentation through construction

  • Small projects where the scope can be defined clearly

Next

Does this package fit?

Book a 20-minute call and we’ll go over your contract’s details. We respond to your request, and the quote comes with scope and timelines in writing.

Work with Renka design and documentation · Renka Consulting