From direct cost to price
- AIU calculator with VAT (Colombia)Calculates administration, contingency and profit on the direct cost, and VAT on fees or on profit. With worked example, method and limits. Colombia.Open
- Unit price calculator (Mexico)Builds a unit price from direct cost, indirect costs, financing, profit and additional charges, and computes VAT. With worked example and limits. Mexico.Open
- Overhead and profit calculator (US)Computes a construction price with overhead on direct cost, profit on direct plus overhead, and sales tax on materials. With example and limits. United States.Open