Free tool

How many hours a month do site reports cost you?

Short answer

Multiply your projects, your reports and the hours each takes to see how much time and money goes every month. The review time with the platform stays empty until you measure it on your own data: the tool does not invent that figure.

Updated October 23, 2026 · Published by Renka Consulting

Today

90 h a month on reports

COP 5,400,000 a month · COP 64,800,000 a year

With the platform

Enter how long reviewing a draft would take to see what you get back.

Ask for a trial report with my data

What it calculates

How many hours a month it takes to put together the site reports (daily, weekly, monthly) and what they cost at the hourly value of whoever prepares them. This is the part you know: your sites, your reports and your time.

The second part, how long you spend reviewing a draft that arrives already assembled, starts empty on purpose. Nobody knows that figure until it is measured with a test on your own data; that is why the tool does not make it up.

Method: the formula step by step

Reports per month = sites × reports per site per month Hours per month today = reports per month × hours per report Cost per month today = hours per month × hourly cost Hours recovered = reports per month × (hours today − hours reviewing the draft) Workdays = hours recovered ÷ 8

If the review time you enter is equal to or greater than the current one, the hours recovered are zero, never negative.

Worked example, today's side

With 3 sites, 5 reports per site per month and 6 hours per report, that is 15 reports and 90 hours a month. At an hourly value of COP 60,000, that costs COP 5,400,000 a month and COP 64,800,000 a year.

Assumptions and limits

  • It counts only the time spent putting reports together; it does not measure other tasks or the cost of errors or delays.
  • The hourly cost is the one you enter; it does not include payroll charges or opportunity costs unless you add them.
  • A workday is taken as 8 hours.
  • The country only changes the currency and the initial hourly value.
  • Calculation in your browser: nothing you type is sent.

Frequently asked questions

Does the tool promise to save hours?

No. It calculates with the numbers you enter. The time with the platform stays empty until you measure it with a test on your own data.

How do I measure the review time?

Ask for a trial report with the data of one of your sites, read it the way you would to sign it off and note how long it takes you.

What counts as a report?

Any periodic site deliverable that you put together by hand: daily, weekly, monthly, supervision (interventoría) or progress reports.

Sources

  • This tool does not rely on a regulation or on external data: it is arithmetic with the numbers you enter.The formulas are in the method section and are implemented by the calculator's code.
Site report hours simulator · Renka Consulting