Guide

V2F form (Bogota, IDIGER): post-earthquake evaluation step by step

Short answer

The V2F is the form a professional uses to record a building's condition after an earthquake. It has five partial classifications and the global one is the most critical of them. The platform orders the boxes and computes a preliminary classification; the decision and signature belong to the professional.

Updated October 23, 2026 · Published by Renka Consulting

What the V2F form is

It is the form a professional uses to record the condition of a building after an earthquake and to propose what to do with it: keep using it, restrict its use, vacate it or cordon it off. Renka's platform implements the V2F and, according to its internal documentation, starts from the form used by IDIGER (the district risk-management and climate-change institute of Bogotá, Colombia), which in turn is based on one prepared by the Asociación Colombiana de Ingeniería Sísmica (the Colombian Association for Earthquake Engineering) in 2002.

Before the visit

  • Confirm who authorizes you to enter and that the building is safe to enter. If there is an evident risk of collapse, the first decision is not to go in.
  • Bring the form, a camera or a phone for dated photos, and the appropriate protective equipment.
  • Define whether the inspection will be exterior only or will include the interior: the form records it.
  • Write down the address and the cadastral data before arriving; they are what identifies the case afterwards.

The form, section by section

The platform's form has 12 sections and 85 fields. These are the sections, how many fields each one has and which partial classification it feeds.

Form sections in the platform
SectionFieldsPartial classification
Cadastral identification and inspection9Does not classify
Description of the structure9Does not classify
General condition of the building3A. General condition of the building
Geotechnical problems3B. Geotechnical problems
Damage to architectural (non-structural) elements12C. Damage to non-structural elements
Damage to structural elements (most affected floor)5D. Damage to structural elements
Problems in the surroundings2E. Problems in the surroundings
Overall damage and prior classification3Does not classify
Recommendations and safety measures4Does not classify
Pre-existing conditions17Does not classify
Effect on occupants and occupancy11Does not classify
Comments and inspectors7Does not classify

Step 1. Identify and describe

Record the location, the use, the structural system and the number of floors. Describe what holds the building up, not the visible finish: two buildings that look the same from outside can have different structures.

Step 2. Observe the general condition, the ground, the non-structural elements and the structural elements

Each block has its own fields. For the structure, the form does not ask for a severity but for a percentage split of the elements of each type among five damage levels, referred to the most affected floor. If the split does not add up to 100%, it must be reviewed: distributing the difference would be inventing data.

Step 3. Look at the surroundings

A neighboring building in danger or an imminent adverse event can make a sound building impossible to occupy. That is why the surroundings have their own classification.

Step 4. Recommend and sign

A serious classification with no safety measures is a report that says "do not enter" and does not say what to do. The platform blocks approval until there is at least one measure.

How the classification is reached

The five partial classifications are: A, general condition of the building; B, geotechnical problems; C, damage to non-structural elements; D, damage to structural elements; E, problems in the surroundings. Each one can give one of four results, from least to most serious: habitable (green); restricted use (yellow); not habitable (orange); danger of collapse (red).

  • The global classification is the most critical of the five partial ones. It is not an average or a sum: one serious partial classification rules.
  • "Could not be determined" is not "no": it means it could not be looked at. Treating it as the absence of damage would turn what was not seen into a sound building.
  • What remains to be observed can only make the result worse, never better. If there is a serious finding, it is reported even if fields are missing; if everything seen is good but something is missing, the platform abstains instead of giving "habitable".
  • The reviewer can set a partial classification by hand. It is respected as is and recorded: whoever signs is whoever answers for it.

Worked example: from the five partial classifications to the global one

A hypothetical building with these five partial classifications. The results are invented; the rule for combining them is the one in the platform's form.

Partial and global classifications
ClassificationResult
A. General condition of the buildingHabitable (green)
B. Geotechnical problemsHabitable (green)
C. Damage to non-structural elementsRestricted use (yellow)
D. Damage to structural elementsNot habitable (orange)
E. Problems in the surroundingsHabitable (green)
Global (the most critical of the five)Not habitable (orange)

Even though three of the five partial classifications are habitable, the global one follows the worst. That is why they are not averaged: a column with heavy damage is not offset by a sound ceiling.

What a professional must validate

  • Every field marked as observed: whatever is filled in from photos or from an assistant is a draft until the person inspecting confirms it.
  • The percentage splits of structural damage.
  • The global classification and each partial one, before handing them to whoever decides on occupancy.
  • The safety measures and the contact information.
  • That the format used is the one required by the authority it is filed with.

Common mistakes

  • Leaving fields blank: blank reads as "no damage", which means the opposite of "not observed".
  • Assessing a building without seeing the foundation and not saying so.
  • Rating by what is seen in the finish when the damage is in the structure.
  • Forgetting the surroundings: an unstable slope next door does not show on the facade.

Frequently asked questions

Does the platform say whether a building is habitable?

Not on its own. It calculates a preliminary classification with fixed rules and presents it for a professional to review, correct and sign.

What happens if I cannot see part of the building?

Mark it as not observed. That does not improve the result: if what has been seen is serious, it is reported; if everything seen is good but something is missing, "habitable" is not issued.

How many fields does the form have?

85 in the platform's version, spread over 12 sections.

Is this form useful outside Colombia?

The platform has equivalent forms for Mexico and the United States, with their own categories. This guide covers only Colombia's V2F.

Sources

  • Internal documentation of Renka's platform (post-earthquake assessment module)No public URL. The origin of the form (IDIGER, AIS 2002) and its validity were not checked against a primary source in this review.
V2F post-earthquake form: step by step · Renka Consulting